Codling Bank II

Slideshow

© 2006 - 2013 Fred.Olsen Renewables

Site by Leadout Projects

Codling Bank II

Codling Bank II will be an extension of the planned Codling Bank Wind Farm.
LATEST NEWS 

Click here for location maps 

The Codling Bank II or Codling Extension (as it is sometimes called) is a proposed follow on project to the consented Codling Bank Wind Farm and will be directly adjacent to the first development. Codling Bank II proposes the construction of 200 wind turbine generators with up to 1000MW of installed capacity. The wind frame is offshore to the south east of the shallow sand bank known as Codling Bank approximately 13 kilometres off the east coast of Ireland, between Greystones and Wicklow.

The water depths are between 11m and 18m in the area of the proposed wind farm. The closest town on the coast is Newcastle, situated some 13.8km from the wind farm and Wicklow is 17km to the south west.